The Rotary Club of Los Altos set up its canopy tents in Lincoln Park again this weekend, the way it has every August for half a century. This year marked the 51st Fine Art in the Park, running Saturday and Sunday from 10 a.m. to 5:30 p.m., the kind of fixture that barely needs an announcement because everyone downtown already knows it's coming. Walk two blocks north to First Street and the mood shifts. There, the city is in the middle of deciding what an entire block of downtown looks like ten years from now, and this November, voters will have a say in it.
That's the real story of downtown Los Altos this summer. It's not one thing happening. It's two things happening at once, in the same six or eight blocks, pulling in opposite directions. The town's oldest civic rituals are holding steady. Its physical future is genuinely up for grabs.
The Block That Finally Filled In
For years, 145 First St. sat behind construction fencing. The space had been Bumble, then House on First, then nothing, after House on First closed in 2021. This year, Luna Mexican Kitchen finally opened there, the third location for chef and founder Jo Lerma-Lopez, whose Luna Mexican Kitchen brand has earned a Michelin Bib Gourmand designation. Lerma-Lopez has said she noticed the property years earlier, drawn to the 1920s Craftsman building and its redwoods, and held onto the idea long before permits and construction actually let her open the doors.
A few doors down, Haru Japanese Restaurant opened on Friday, June 1, under chef-owner Gavin Liang, whose résumé includes Hinata and Sasa in San Francisco and Sushi Jin. Liang has said the decision to build something more casual in the South Bay, rather than another high-end omakase counter, came from watching how many strictly omakase restaurants had already opened in Santa Clara County. Haru's gozen sets pair grilled wagyu or miso black cod with a rotating list of rice bowls, including one topped with salmon roe and sea urchin, alongside a sushi bar built around dry-aged fish.
Two restaurants, two very different bets: one on patience, waiting out two years of fencing and permits for a specific 1920s building. The other on timing, filling a gap in what Liang saw as an oversaturated high-end market.
Fifty-One Years of the Same Saturday
The Fine Art in the Park anniversary isn't the only marker of downtown continuity this summer. The Los Altos Village Association, known locally as LAVA, is marking its own 60th year promoting and beautifying downtown on behalf of what it counts as more than 150 member businesses. The city's free Summer Concert Series, run by the Community Services department, is back at Grant Park and Hillview Soccer Fields, with shows starting promptly at 6:30 p.m. throughout the season.
None of this is new territory for Los Altos. It's proof that the parts of downtown built on routine, a festival, a concert series, a merchants' association, keep running regardless of what else is unresolved. That stability matters, because two blocks away, almost nothing about downtown's physical layout is settled.
Two Blocks Away, Nobody Agrees on What's Next
Since February 2025, the city has been working through a design process for what it calls a Downtown Park with Parking, targeting Parking Plaza 1 and Plaza 2, both currently surface lots. The city awarded a contract to Watry Design worth up to $2,288,500 for community engagement and concept work. At a February 24, 2026 meeting, the City Council directed the design team to drop underground parking from consideration and pursue only parking replacement options the council characterized as neutral or positive for the existing supply.
The stakes go beyond a park. Los Altos Stage Company, which runs the Bus Barn Theater, has proposed replacing its current theater with a new one on Plaza 2, tying the fate of a local performing arts group to the same patch of asphalt the park design is meant to reimagine. Downtown's current parking supply, according to the city's 2024 Downtown Parking Strategy, totals 2,504 spaces, including 395 on-street spots and 1,305 public off-street spots. Whatever happens to Plaza 1 and 2 will move some of that number.
Two of the eight downtown parking plazas, Plaza 7 and Plaza 8, were separately declared surplus land by the city in 2024, a designation that under California's Surplus Land Act made them eligible for affordable housing proposals. That designation sits alongside the park and theater conversations as part of the same broader debate over what the plazas should become.
The Vote That's Actually on the Ballot This November
A group called ForLosAltos formed in response, arguing that decisions this large, involving publicly owned land used by shoppers and residents every day, shouldn't rest with a single City Council. The group launched a signature drive in April 2026, needing 3,000 valid signatures from registered Los Altos voters by April 30 to qualify a ballot initiative. Their proposed ordinance would require voter approval before any of the eight downtown parking plazas could be sold, repurposed, or reduced. It explicitly carves out room for the two plazas already slated for affordable housing and states it wouldn't interfere with farmers markets or similar community events already held on the lots.
"Before any single city council makes irreversible decisions about these irreplaceable assets, residents deserve a vote."
That's how ForLosAltos member JoAnne Estill framed the effort. Draeger's Market owner Richard Draeger and campaign organizer Cindy Andrews made similar arguments, that a decision of this scale belongs in front of voters rather than settled by council vote alone. On June 25, 2026, the City Council agreed, at least on the question of letting the public weigh in, voting unanimously to place the ordinance on the November 3, 2026 ballot.
That vote doesn't resolve the underlying disagreement. It just moves the decision from a council chamber to a ballot box. Los Altos Stage Company has said the uncertainty complicates its ability to raise money for a new theater in the meantime. Mayor Sally Meadows has declined to comment on the ballot measure directly.
What This Means for the Rest of the Season
Here's the thing worth sitting with if you live near downtown: none of this is settled yet. Draft concepts for Plaza 1 and 2 already went in front of the Council in February, and the design team is running another round of community engagement this summer to refine them before anything goes back to the Council. The ballot outcome won't be known until November. Meanwhile, Haru and Luna are already open and seating guests on First Street, and next August, the Rotary Club will set up in Lincoln Park for a 52nd time regardless of how any of the plaza questions shake out.
That's the actual shape of downtown Los Altos in August 2026. The businesses opening this year aren't waiting for the parking fight to resolve itself. They're operating on the assumption that whatever downtown looks like in five years, people will still want a table on First Street on a Saturday night. Whether that assumption is right is, in a very literal sense, up to the voters this November.
If you're watching how these changes might affect a home near downtown, whether that's parking access, foot traffic, or simply what your block will look like in a few years, Hummingbird Homes can walk you through what's actually on the table. Contact Us.